NEWS

Work on the T8, T9 and T10 is back in full swing.

Work on the T8, T9 and T10 is back in full swing.

After the heavy rains, construction work on the T8, T9 and T10 crossings between Dubréka prefecture and Matoto commune is back on track. Asphalting work is being carried out as follows: -𝐓𝐫𝐚𝐧𝐬𝐯𝐞𝐫𝐬𝐚𝐥𝐞𝐬 𝟖 T8 North (2881 meters) , T8 South (2600 meters) -𝐓𝐫𝐚𝐧𝐬𝐯𝐞𝐫𝐬𝐚𝐥𝐞𝐬 𝟗...

read more

Pin It on Pinterest